NPI & Production Ramp-Up
Take your product from prototype to the first production runs with your EMS, without surprises.
Defect rate in volume production
Volume production experience
Design Award 2016 for LaMetric TIME
Countries our devices ship to
The problem
The first production run is where design, test, provisioning and supply chain meet. Gaps here cause weeks of delay and poor yield.
Pilot run surprises
Design, test and supply gaps all appear at once on the first run.
Poor early yield
Low yield in the first batches delays shipments.
Unclear EMS handover
Missing documentation slows the contract manufacturer.
What we do
Readiness checklist, pilot run reports and ramp plan.
Production readiness review
EMS onboarding and documentation package
Pilot runs and yield analysis
Issue triage on the line
Ramp-up plan
Our Engineering Process
From design review to a stable production line, together with your EMS.
1. Design review
2. Process design
3. Station build
4. Pilot run
5. Volume support
Planning something similar?
Tell us where you are. A senior engineer replies within one business day.
Related services
FAQ
Can you help choose an EMS?
Talk to an engineer, not a salesperson
Idea, prototype, production or a fleet in the field: tell us where you are. A senior engineer replies within one business day.
Your benefits:
- Senior embedded engineers
- Hardware, firmware and cloud
- From prototype to fleet
- Clear scope and next steps
- Direct technical answers
- No sales pitch
What happens next?
A free 30-minute call with a senior engineer
A short technical discovery
A proposal with scope, timeline and cost