Service

Component Lifecycle & Supply Risk Review

Check every critical part for lifecycle, availability, second sources and cost before it locks you in.

<1
%

Defect rate in volume production

Foxconn

Volume production experience

Red Dot

Design Award 2016 for LaMetric TIME

20
+

Countries our devices ship to

The challenge

The problem

A single end-of-life or allocated part can stop production for months. Many BOMs have no second source for critical components.

Single-source parts

One allocation or EOL notice can stop production.

Long lead times

Critical parts with long lead times delay builds.

No qualified alternatives

Switching parts under pressure risks quality.

What we do

BOM risk report with alternatives for high-risk parts.

Lifecycle and EOL risk check

Availability and lead-time review

Second-source identification

Qualification plan for alternatives

Cost comparison

How we work

Our Engineering Process

From design review to a stable production line, together with your EMS.

Design review step icon

1. Design review

DFM, DFT and component risks checked before release.
Process design step icon

2. Process design

Test, programming, provisioning and traceability steps defined with your EMS.
Station build step icon

3. Station build

Fixtures, software and operator UI built and validated.
Pilot run step icon

4. Pilot run

First builds measured for yield, test time and failures.
Volume support step icon

5. Volume support

Issues fixed fast as production scales.

Planning something similar?

Tell us where you are. A senior engineer replies within one business day.

Services

Related services

Engineer analysing a circuit board in a lab

Lower your bill of materials without hurting reliability or features.

Green system board with microchips and transistors Engineer

Choose the processor, SoM and peripherals that will still make sense at volume: performance, power, BSP quality, lifecycle and cost.

Row of Five Pick and Place Nozzles Descends Over a Green Cir

Make your device easy and cheap to build at volume before the first production run.

FAQ

We use distributor and lifecycle data sources.
Yes, including firmware changes needed.
Contact us

Talk to an engineer, not a salesperson

Idea, prototype, production or a fleet in the field: tell us where you are. A senior engineer replies within one business day.

Your benefits:

What happens next?

1

A free 30-minute call with a senior engineer

2

A short technical discovery

3

A proposal with scope, timeline and cost

Tell us about your project

PDF, Office, images or ZIP, up to 10 MB