Component Lifecycle & Supply Risk Review
Check every critical part for lifecycle, availability, second sources and cost before it locks you in.
Defect rate in volume production
Volume production experience
Design Award 2016 for LaMetric TIME
Countries our devices ship to
The problem
A single end-of-life or allocated part can stop production for months. Many BOMs have no second source for critical components.
Single-source parts
One allocation or EOL notice can stop production.
Long lead times
Critical parts with long lead times delay builds.
No qualified alternatives
Switching parts under pressure risks quality.
What we do
BOM risk report with alternatives for high-risk parts.
Lifecycle and EOL risk check
Availability and lead-time review
Second-source identification
Qualification plan for alternatives
Cost comparison
Our Engineering Process
From design review to a stable production line, together with your EMS.
1. Design review
2. Process design
3. Station build
4. Pilot run
5. Volume support
Planning something similar?
Tell us where you are. A senior engineer replies within one business day.
Related services
FAQ
Do you have supply chain data?
Can you qualify alternatives?
Talk to an engineer, not a salesperson
Idea, prototype, production or a fleet in the field: tell us where you are. A senior engineer replies within one business day.
Your benefits:
- Senior embedded engineers
- Hardware, firmware and cloud
- From prototype to fleet
- Clear scope and next steps
- Direct technical answers
- No sales pitch
What happens next?
A free 30-minute call with a senior engineer
A short technical discovery
A proposal with scope, timeline and cost