
BOM & Manufacturing Cost Reduction
Lower cost per unit: bill of materials, components, PCB and assembly, test time and yield, without hurting reliability. From the team behind LaMetric.

Lower cost per unit: bill of materials, components, PCB and assembly, test time and yield, without hurting reliability. From the team behind LaMetric.

Move to a new system-on-module or SoC because of cost, end-of-life or performance, with the software coming along.

When a connected product is late, unstable or stuck, we take over, stabilise it and get it shipped.

Find the root cause of failures in deployed devices and fix them across the fleet.

Stuck on an old vendor kernel nobody supports? We move you to a maintained, secure Linux stack.

Switch from a design house or ODM that is not delivering, without losing knowledge or momentum.
Idea, prototype, production or a fleet in the field: tell us where you are. A senior engineer replies within one business day.
A free 30-minute call with a senior engineer
A short technical discovery
A proposal with scope, timeline and cost
Inactive
Inactive