CE, RED & FCC Certification
Get connected products through CE, RED and FCC with fewer surprises: design for compliance, pre-compliance testing and test lab coordination.
Defect rate in volume production
Volume production experience
Design Award 2016 for LaMetric TIME
Countries our devices ship to
The problem
Certification failures late in a project mean redesigns, new prototypes and missed launch dates.
Late failures
Emissions or radio issues are found at the test lab.
Unclear requirements
Teams are unsure which directives and standards apply.
Missing documentation
Technical files and declarations hold up approval.
What we do
A clear path to approval, from design to declaration.
Applicable directives and standards mapped for your markets
Design reviews for EMC, radio and safety
Pre-compliance testing before the lab
Test lab coordination and fixes
Technical documentation for approval
Our Engineering Process
Compliance designed in, not tested in at the end.
1. Requirements mapping
2. Design for compliance
3. Pre-compliance testing
4. Lab coordination
5. Approval and documentation
Related Case Studies
Planning something similar?
Tell us where you are. A senior engineer replies within one business day.
Related services
FAQ
Do you run the formal tests?
When should we start?
Talk to an engineer, not a salesperson
Idea, prototype, production or a fleet in the field: tell us where you are. A senior engineer replies within one business day.
Your benefits:
- Senior embedded engineers
- Hardware, firmware and cloud
- From prototype to fleet
- Clear scope and next steps
- Direct technical answers
- No sales pitch
What happens next?
A free 30-minute call with a senior engineer
A short technical discovery
A proposal with scope, timeline and cost