BOM & Manufacturing Cost Reduction
Lower your bill of materials without hurting reliability or features.
Defect rate in volume production
Volume production experience
Design Award 2016 for LaMetric TIME
Countries our devices ship to
The problem
BOMs designed for speed-to-prototype carry cost at volume: over-specified parts, single sources, unused features.
Over-specified parts
Prototype choices carry extra cost into volume production.
Single sources
Lack of alternatives weakens your negotiating position.
Unused features
Components paid for but not used by the product.
What we do
Prioritised cost-down plan with savings, effort and risk per item.
Line-by-line BOM review
Over-specification and consolidation
Alternative parts and second sources
Firmware changes to enable cheaper parts
Savings model per volume
Component Cost Reduction
Target the components that drive your cost: processors, memory, radios, power and connectors.
PCB Cost Reduction
Reduce board cost without losing reliability: layer count, panelisation, components and assembly steps.
Manufacturing Cost Reduction
Lower cost per unit on the line: test time, assembly steps, yield and rework.
Our Engineering Process
Lower cost per unit without trading away reliability.
1. Baseline
2. Analysis
3. Proposal
4. Implementation
5. Production change
Planning something similar?
Tell us where you are. A senior engineer replies within one business day.
FAQ
How much can we save?
Do changes require recertification?
Do you also do Component Cost Reduction?
Do you also do PCB Cost Reduction?
Do you also do Manufacturing Cost Reduction?
Talk to an engineer, not a salesperson
Idea, prototype, production or a fleet in the field: tell us where you are. A senior engineer replies within one business day.
Your benefits:
- Senior embedded engineers
- Hardware, firmware and cloud
- From prototype to fleet
- Clear scope and next steps
- Direct technical answers
- No sales pitch
What happens next?
A free 30-minute call with a senior engineer
A short technical discovery
A proposal with scope, timeline and cost