Service

Production Test & Programming

Test stations for every stage of your line: SMT tests for PCBs, FATP tests for finished devices, aging and a report for every unit. Built on the framework we use for LaMetric production.

<1
%

Defect rate in volume production

Foxconn

Volume production experience

Red Dot

Design Award 2016 for LaMetric TIME

20
+

Countries our devices ship to

The challenge

The problem

Test stations built in a hurry are slow, hard to operate and impossible to replicate at a second factory.

Stations built in a hurry

Ad-hoc stations are slow, fragile and hard to operate.

Hard to replicate

Adding a second line or EMS means rebuilding from scratch.

Operator errors

Complex UIs and manual steps cause mistakes on the line.

What we do

Turnkey stations or station software with documentation and training, based on our own Manufacturing Test Framework.

SMT test stations for PCBs

Fixtures and test apps that check each board after assembly: radios, audio, LEDs, keys, memory and interfaces.

FATP stations for finished devices

Scan, test every function and show the result to the operator, ending with a packed-weight check.

Aging

Aging racks and software for finished products before they ship.

Reports and traceability

A report for every unit: per-test results, test log, part connection and repair logs, and the components on the board.

Production programming and flashing

Verified programming of every unit on the line, with the right firmware version and configuration.

Replication across lines and EMS sites

Stations designed to be rebuilt at a second line or another EMS.

One framework from SMT to reports

Every station writes to the same records, so each unit has one report: SMT results for its PCB, FATP results for the finished device, aging, and the test, connection and repair logs. Example from LaMetric SKY production (identifiers blurred).

How we work

Our Engineering Process

From design review to a stable production line, together with your EMS.

Design review step icon

1. Design review

DFM, DFT and component risks checked before release.
Process design step icon

2. Process design

Test, programming, provisioning and traceability steps defined with your EMS.
Station build step icon

3. Station build

Fixtures, software and operator UI built and validated.
Pilot run step icon

4. Pilot run

First builds measured for yield, test time and failures.
Volume support step icon

5. Volume support

Issues fixed fast as production scales.
Case Studies

Related Case Studies

LaMetric SKY modular smart display

How we engineered a modular light where every panel has its own electronics and firmware, yet any shape on the wall maps itself with one phone scan and updates over the air as one product.

Accelerators

Related accelerators

Production test station showing an SA01 LED test PASS result

Service Category

Our production test framework: SMT tests for PCBs, FATP tests for finished devices, aging, and a report for every unit. Built for our own LaMetric production and adapted to your product.

Planning something similar?

Tell us where you are. A senior engineer replies within one business day.

Services

Related services

Technician handling a circuit board on a production line

Give every device a unique, trusted identity from the factory to the cloud: keys, certificates and a PKI that handles provisioning, rotation and revocation across the whole fleet.

Workers Assembling Electronic Components on Factory Assembly

Take your product from prototype to the first production runs with your EMS, without surprises.

FAQ

SMT tests for PCBs, FATP tests for finished devices including a packed-weight check, aging, and reports for every unit.
Yes, or software for stations your EMS builds.
Results per test suite and per test, the test log, part connection and repair logs, the components fitted to the PCB and the diagnostics version.
Yes. Verified programming of every unit on the line, with the right firmware version and configuration.
Contact us

Talk to an engineer, not a salesperson

Idea, prototype, production or a fleet in the field: tell us where you are. A senior engineer replies within one business day.

Your benefits:
What happens next?
1

A free 30-minute call with a senior engineer

2

A short technical discovery

3

A proposal with scope, timeline and cost

Tell us about your project
PDF, Office, images or ZIP, up to 10 MB